How do you perform a rate analysis?

How do you perform a rate analysis?

Rate analysis for Concrete- Step by Step calculation with table

  1. Step -1 Write all the known values of the materials.
  2. Step -2 Calculate dry volume of concrete.
  3. Step -3 Calculate volume of all materials.
  4. Step -4 Convert volume of cement into numbers of bags.
  5. Step- 5 Calculate weight of steel rod.

What is RCC analysis?

For rate analysis of RCC, we need to multiply each quantity with their rates to get the amount for every item of work. Rates vary from place to place and time to time. It is advisable to assume local rates or standard rates of the place.

How do you calculate rate analysis for brickwork?

RATE ANALYSIS OF BRICKWORK

  1. Assuming:-
  2. Volume of brickwork = 1m³
  3. Size of brick—>19x9x9 cm.
  4. Thickness of mortar = 10mm (1cm)
  5. No. of bricks = Volume of brickwork/ volume of 1 brick with mortar.
  6. Volume of 1 Brick with mortar = 0.20×0.10×0.10=0.002 m³
  7. ∴ No.
  8. Volume of bricks= (0.19×0.09×0.09) x 500 = 0.001539 x 500 = 0.7695 m³

What are the factors considered while preparing the analysis of rates?

Factors which affect the rate analysis of civil works are: Specification of the civil work and materials such as quality of materials, proportion of mortar or concrete, thickness of plastering, number of coats of painting, depth of excavation, type of soil etc.

What is the purpose of rate analysis in civil engineering?

Purpose of Analysis of rates: To work out the actual cost per unit of the items at the locality. To examine the viability of rates offered by contractors. To calculate the number of materials and labour strength required for project planning.

How do you calculate the rate analysis of concrete?

Dry volume = 1.54 × 1 = 1.54 m3. Quantity of cement = 1/7 × 1.54 m3 × 1440 kg/m3 = 316.8 kg, no of bag cement for 1m3 m15 concrete = 316.8/50 = 6.3. If rate of cement = INR 400 per bag, then cost of 6.3 bags cement = 6.3 ×400 = INR 2520.

What is a rate analysis?

Rate analysis is the basis for arriving at a correct rate per unit work or supply of work specifications such as labor, materials, and equipment. It can also be defined as the analytical study that leads to the definition of unit rates of work by identifying the basic requirements.

What is the rate of RCC?

RCC cost per cubic feet (cft) is around 176200/416.6 = rs 423. RCC cost per cubic feet (cft):- the cost of RCC is differ from place to place according to raw material cost at particular place. However in general rates/cost of RCC is around rs 423 per cubic feet (cft).

What is the Labour cost for brick work?

Labour rate and their cost:- for construction of 100 square foot 9 inch thick brick wall we need 2 mason and 3 helper, mason rate is around INR600 and helper rate is around INR 400, total labour charge & cost = (600×2) + (400×3) = INR 2400, so labour cost is around INR 2400 are required for construction of 100 square …

What is the rate of plaster?

Wall Plaster Cost For 1000, 2000, 3000,4000, & 5000 sq. ft area

Description Rate Per sq.ft 1000 sq.ft
Wall Plaster Labour Rs.25/- per sq.ft Rs.25/-* Rs.25,000
Material Cost (Plastering M-Sand, Cement) – Rs.35/- per sq.ft Rs.35/-* Rs.35,000
Total Cost of Wall Plaster Rs.60/- per sq.ft Rs.60/-* Rs.60,000/-*

What is rate analysis in civil engineering?

What is Rate Analysis? The determination of rate of particular item of work per unit from the cost of quantities of materials, cost of labours and other miscellaneous petty expenses required for the completion of the work is known as ‘Rate Analysis’.

What is the need for rate analysis in construction projects?

With the help of rate analysis actual cost of items can be determined on the location. It helps to cross check the rates offered by contractor. To find out the exact quantity of materials and labours required for specific work. To finalise the labour contract rates.

What are the main purposes of rate analysis?

What is the rate of 1 m3 concrete?

The Labour cost for concrete work is around 70 to 75 Rs per cft (cubic foot) or 2500 to 2650 Rs per cubic meter (m3). The Labour Cost for PCC concrete is around 30 to 35 Rs per sq ft (square foot) or 320 to 400 Rs per cubic meter (m3).

What is the rate of PCC?

Rate Analysis for PCC in 1:3:6 Cement: 280 Rs per bag. Sand: 990 Rs per Cum. Course Aggregate: 880 Rs per cum. Labour charges: 1200 Rs per Cum.

How do you calculate plaster work?

Calculation of quantity of material for 12 mm thick plaster of ratio 1: 6 (1 Cement:6 Sand) in the wall for 100 Sqm

  1. Quantity of Cement = 2/(1+6) × 1 (1 Ratio of cement)
  2. In Kg = 0.30 × 1440 (Density of cement = 1440 kg/m3)
  3. Quantity of Sand = 2/(1+6) × 6 (6 Ratio of sand)
  4. In Cubic Feet = 63.558 cft (1 Cum = 35.31 cft)

What is the purpose of rate analysis?

Purpose of Analysis of rates: 1. To work out the actual cost of per unit of the items. 2. To work out the economical use of materials and processes in completing the particulars item.

What is SSR in civil engineering?

Standard Schedule Of Rates (SSR)

What is DSR in civil engineering?

Delhi Schedule of Rates popularly called as DSR is updated as 2021 edition and includes existing items of DSR 2019 with (a) deletion of few items which are not in use now, (b) merger of similar items, and (c) addition of new items in line with emerging trends in construction Industry. 2.

What is RMC rate?

RMC Ready Mix Concrete, Grade Standard: M20, M25, 6 Cubic Meter Per Vehicle, Rs 3800/cubic meter | ID: 17248768973.