Is Chenani-Nashri tunnel open?

Is Chenani-Nashri tunnel open?

It is India’s longest road tunnel with a length of 9.028 km (5.6 mi), and the country’s first tunnel with a fully integrated tunnel control system. It reduces the distance between Jammu and Srinagar by 30 km and travel time by two hours….Dr. Syama Prasad Mookerjee Tunnel.

Overview
End Nashri
Operation
Work begun July 2011
Opened 2 April 2017

Is Zojila tunnel completed?

The last phase of the Zojila tunnel construction works is expected to be completed in September 2025, ahead of its deadline of November 2026. As per the officials, the tunnel could be opened by September 2024 to allow the movement of the armed forces.

Is Chenani-Nashri tunnel longest?

Currently, the Chenani-Nashri tunnel, which is also situated in Jammu and Kashmir, is the longest bi-directional tunnel in Asia at 10.89 km.

Who built Nashri tunnel?

The dedicated team of professionals brought their vast experience to the project construction. Savronik implemented the intelligent highway and tunnel control system for the project. Ambuja have supplied 63 lakh bags of cement over 5 years at the CNTL project.

Who constructed Nashri tunnel?

Which is Asia largest tunnel?

Zojila tunnel
India’s longest road tunnel and Asia’s longest bi-directional tunnel is Zojila tunnel. This will help in boosting tourism in the Himalayan Region.

Is Sonmarg closed?

The road from Srinagar to Sonamarg gets closed sometime in December and does not open until March. So if you want to enjoy some snow and possibly even catch a live snowfall, December and March are the best months to be heading towards Sonamarg.

Is Kargil road open?

The road was declared open on the 25th of March after the snow-clearing operation at Zojila Pass was completed. For safety reasons, the traffic across the pass is regulated for now. From the Kargil side, vehicles are allowed to travel between 4 am to 10 am….Srinagar Leh Highway Status 2022.

Route Status
Kargil to Padum Open

Is Zojila tunnel open?

Zoji La is 15 km from Sonamarg and provides a vital link with Drass and Kargil in Ladakh but remains closed for 6–7 months (from November to May) during winter due to heavy snow fall & snow avalanches. It takes more than 3 hours to cross the pass but the tunnel will reduce the time.

Is Srinagar Pahalgam road open?

It is never blocked. Simply from Tanamarg, you’d be going in a 4*4 vehicle with chains in tyres owing to snow though never heard it closing due to snow. Srinagar to Pahalgam will be open all through.